Menu

Activity Update

See more on LinkedIn: Visit ClearWELL™ on LinkedIn

Date: January 2020

Ten new Colombia ESP installations

More ClearWELL™ units are being rolled out in the Colombian oil and gas market via our exclusive agent Delrio SAS. Here are ten new installations for a customer just south of Villanueva.

These ESP wells are all around 8,000 - 10,000 feet in depth with high surface temperatures of over 120 degrees Fahrenheit. Our units are treating these wells to prevent calcium carbonate scale from forming downhole and on the ESP equipment. This results in savings of hundreds of thousands of dollars for each well, every year, by reducing or eliminating remedial well intervention and the use of chemicals, whilst maintaining production.

For more information on how we can help you manage your pipeline scale and production flow assurance please contact Delrio on delrioco@delrio.com.co or ClearWELL on sales@clearwelloilfield.com

Case Studies, Projects and New Installations

Activity Update

First UK onshore installation for IGas Energy

Date: September 2020
First UK onshore installation for IGas Energy

Activity Update

First agent installation in the Sultanate of Oman is backed by remote operational support

Date: July 2020
First agent installation in the Sultanate of Oman is backed by remote operational support

Activity Update

Offshore and onshore installations in West Central Africa

Date: April 2020
Offshore and onshore installations in West Central Africa

Activity Update

Rod pump oil well in Canada protected from scale since 2016

Date: January 2020
Rod pump oil well in Canada protected from scale since 2016

Activity Update

West Africa ESP well installation

Date: December 2019
West Africa ESP well installation

Activity Update

Sub-zero scale control solution

Date: November 2019
Sub-zero scale control solution

Activity Update

Water injection well and horizontal pumps protected from calcite in the Permian

Date: November 2019
Water injection well and horizontal pumps protected from calcite in the Permian

Activity Update

Alberta ESP well installations

Date: October 2019
Alberta ESP well installations

Activity Update

Successful long term calcite and barite scale prevention at a gas well near the Rocky Mountains

Date: October 2019
Successful long term calcite and barite scale prevention at a gas well near the Rocky Mountains

Activity Update

Harts E&P feature article explaining the benefits of using ClearWELL™ technology on ESP wells

Date: June 2019
Harts E&P feature article explaining the benefits of using ClearWELL™ technology on ESP wells

Activity Update

Haynesville Shale scale protection - one unit, two wells.

Date: March 2019
Haynesville Shale scale protection - one unit, two wells.

Activity Update

Achieving long-term, scale-free production from ESP wells in Canada

Date: March 2019
Achieving long-term, scale-free production from ESP wells in Canada

Case Study

ClearWELL™ Replaces Quarterly Chemical Interventions

Location: Alberta, Canada
Application: Onshore gas lifted oil well
ClearWELL™ Replaces Quarterly Chemical Interventions

Case Study

ClearWELL™ Delivers Over $7Mm Per Annum In Additional Production

Location: Duvernay Shale, Alberta, Canada
Application: Unconventional Oil, Artificial Lift
ClearWELL™ Delivers Over $7Mm Per Annum In Additional Production

Case Study

Severe flowback scaling solved and production assured for a field of gas wells

Location: Haynesville Shale, USA
Application: Unconventional Gas
Severe flowback scaling solved and production assured for a field of gas wells

Case Study

Continuous production reinstated after scale stopped flow every 3 weeks

Location: Pakistan
Application: Onshore Gas Well
Continuous production reinstated after scale stopped flow every 3 weeks

Case Study

ClearWELL™ successfully treats H2S scavenger scaling in Alberta

Location: Montney Shale, Alberta, Canada
Application: Surface Processing, Unconventional Oil, Artificial Lift
ClearWELL™ successfully treats H2S scavenger scaling in Alberta

Case Study

ClearWELL™ Cuts Operational Expense by 70%

Location: Llanos Basin, Colombia
Application: ESP Oil Well
ClearWELL™ Cuts Operational Expense by 70%

Case Study

North Sea Operator Benefits from ClearWELL’s Subsurface Scale Treatment

Location: North Sea
Application: Gas Lift Oil Well
North Sea Operator Benefits from ClearWELL’s Subsurface Scale Treatment

Case Study

ClearWELL™ Prevents Scale Within Surface Processing Equipment

Location: Alberta, Canada
Application: Surface Processing
ClearWELL™ Prevents Scale Within Surface Processing Equipment

Case Study

Efffective Scale Control for an ESP Well and Emulsion Pipeline

Location: Alberta, Canada
Application: Emulsion Pipeline
Efffective Scale Control for an ESP Well and Emulsion Pipeline