Achieving long-term, scale-free production from ESP wells in Canada

In Canada we have been carrying out routine servicing on two of our ESP well installations. Clearwell™ technology is particularly important for wells with Electric Submersible Pumps as it helps to protect this critical equipment from scale and keeps the well flowing.

One of these wells previously averaged 250 days runtime without scale intervention, but since ClearWELL™ was installed it has been running scale free without intervention for over 950 days! The other well is also performing impressively, with over two years of problem free production since installation. Our units are powered by 120v and are connected to the wellhead via a transmission antenna without any well intervention or downtime.

Here you can see our engineer carrying out an inspection which includes unit recalibration and tuning, internal and external diagnostic testing and performance reporting. We are also able to remotely monitor performance from our office, via satellite, to give our customers ongoing peace of mind

Case Studies, Projects and New Installations

Activity Update

First UK onshore installation for IGas Energy

Date: September 2020
First UK onshore installation for IGas Energy

Activity Update

First agent installation in the Sultanate of Oman is backed by remote operational support

Date: July 2020
First agent installation in the Sultanate of Oman is backed by remote operational support

Activity Update

Offshore and onshore installations in West Central Africa

Date: April 2020
Offshore and onshore installations in West Central Africa

Activity Update

Ten new Colombia ESP installations

Date: January 2020
Ten new Colombia ESP installations

Activity Update

Rod pump oil well in Canada protected from scale since 2016

Date: January 2020
Rod pump oil well in Canada protected from scale since 2016

Activity Update

West Africa ESP well installation

Date: December 2019
West Africa ESP well installation

Activity Update

Sub-zero scale control solution

Date: November 2019
Sub-zero scale control solution

Activity Update

Water injection well and horizontal pumps protected from calcite in the Permian

Date: November 2019
Water injection well and horizontal pumps protected from calcite in the Permian

Activity Update

Alberta ESP well installations

Date: October 2019
Alberta ESP well installations

Activity Update

Successful long term calcite and barite scale prevention at a gas well near the Rocky Mountains

Date: October 2019
Successful long term calcite and barite scale prevention at a gas well near the Rocky Mountains

Activity Update

Harts E&P feature article explaining the benefits of using ClearWELL™ technology on ESP wells

Date: June 2019
Harts E&P feature article explaining the benefits of using ClearWELL™ technology on ESP wells

Activity Update

Haynesville Shale scale protection - one unit, two wells.

Date: March 2019
Haynesville Shale scale protection - one unit, two wells.

Case Study

ClearWELL™ Replaces Quarterly Chemical Interventions

Location: Alberta, Canada
Application: Onshore gas lifted oil well
ClearWELL™ Replaces Quarterly Chemical Interventions

Case Study

ClearWELL™ Delivers Over $7Mm Per Annum In Additional Production

Location: Duvernay Shale, Alberta, Canada
Application: Unconventional Oil, Artificial Lift
ClearWELL™ Delivers Over $7Mm Per Annum In Additional Production

Case Study

Severe flowback scaling solved and production assured for a field of gas wells

Location: Haynesville Shale, USA
Application: Unconventional Gas
Severe flowback scaling solved and production assured for a field of gas wells

Case Study

Continuous production reinstated after scale stopped flow every 3 weeks

Location: Pakistan
Application: Onshore Gas Well
Continuous production reinstated after scale stopped flow every 3 weeks

Case Study

ClearWELL™ successfully treats H2S scavenger scaling in Alberta

Location: Montney Shale, Alberta, Canada
Application: Surface Processing, Unconventional Oil, Artificial Lift
ClearWELL™ successfully treats H2S scavenger scaling in Alberta

Case Study

ClearWELL™ Cuts Operational Expense by 70%

Location: Llanos Basin, Colombia
Application: ESP Oil Well
ClearWELL™ Cuts Operational Expense by 70%

Case Study

North Sea Operator Benefits from ClearWELL’s Subsurface Scale Treatment

Location: North Sea
Application: Gas Lift Oil Well
North Sea Operator Benefits from ClearWELL’s Subsurface Scale Treatment

Case Study

ClearWELL™ Prevents Scale Within Surface Processing Equipment

Location: Alberta, Canada
Application: Surface Processing
ClearWELL™ Prevents Scale Within Surface Processing Equipment

Case Study

Efffective Scale Control for an ESP Well and Emulsion Pipeline

Location: Alberta, Canada
Application: Emulsion Pipeline
Efffective Scale Control for an ESP Well and Emulsion Pipeline